Send Email
Send SMS
Search
Concept Deesign Technology


Construction of Residential Swimming Pool

Leading Manufacturer of excavation & digging services, pcc work, steel bar reinforcement work, rcc done from shotgun gunating and glass mosaic tile work from New Delhi.

Excavation & Digging Services

REQUEST CALLBACK

Excavation & Digging Services
Ask for Price

Thanks for Contacting Us.

  1. Remove fence when necessary
  2. Remove concrete walks and patios if called for in the contract.
  3. Set the pool beam elevation and grade with a transit.
  4. Lay out the pool in accordance with the dimensions on the technical plan.
  5. Excavate pool and remove soil from job-site.
  6. Hand shape skimmers, lights, steps, loveseats, and benches.
  7. Hand carve bowl and break.
  8. Final trim and finish work.
  9. Unless provided for in the contract moving or repairing underground utilities or sprinkler systems is the homeowner's responsibility.
Yes! I am Interested

Steel Bar Reinforcement Work

REQUEST CALLBACK

Steel Bar Reinforcement Work
Ask for Price

Thanks for Contacting Us.

Steel rebar is 40-A615, in accordance with Texas steel grading system.

  1. Steel reinforcing bars, (rebar), are placed on 8"-10" centers each way through vertical walls and floor of the pool and 5" centers in transitional areas and stress points.
  2. "Box Beam" construction using four bars of rebar 1/2" in diameter.
  3. Steel is secured by sixteen gauge ties.
Yes! I am Interested

RCC Done From Shotgun Gunating

REQUEST CALLBACK

RCC Done From Shotgun Gunating
Ask for Price

Thanks for Contacting Us.

During the gunite process pool depths, elevations and dimensions are set. Also pool benches and steps are hand shaped and formed.

  1. Pool light niches and electrical conduit are installed.
  2. Gunite will be 4" to 6" thick at walls and floor of the pool, 4" to 6" thick at transitional areas, (stress points), and 12" to 14" thick at the bond beam.
  3. Broom finishing the gunite creates a rough texture allowing the maximum adherence of plaster.
  4. Equipment pad is installed (in most cases).
  5. Homeowner should water the gunite shell at least twice a day for seven days. This allows the gunite to cure properly.
Yes! I am Interested

Glass Mosaic Tile Work

REQUEST CALLBACK

Glass Mosaic Tile Work
Ask for Price

Thanks for Contacting Us.

Our company has achieved milestone in providing Glass Mosaic Tile Work to the clients. Leveraging our years of experience in this domain, we are indulged in providing this service to valuable customers. This service is performed under supervision of team of well-versed professionals. We assure time delivery of this service at low prices in order to attain maximum clients. Offered service is checked by quality inspectors before rendering to the esteemed patrons and is provided by the professionals in a given time frame.

 

Features:

 

  • Offered by skilled professionals
  • Quality resources used
  • Executed within the assured time frame
Yes! I am Interested

PCC Work

PCC Work
Yes! I am Interested


Steel Bar Reinforcement Work

Steel Bar Reinforcement Work
Yes! I am Interested


 
X


Call Us: +91-8071682621
Concept Deesign Technology
Jaivinder Singh (Partner)
No. B- 142, 2nd Floor Back Side Mayapuri Industrial Area, Phase - 1,
New Delhi - 110064, Delhi, India
Contact via E-mail
Contact via SMS



Home  |   Profile   |  Our Product Range  |  Site Map  |   Contact Us   |   Mobile Site

© Concept Deesign Technology. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited

Concept Deesign Technology